Olkiluoto 3 NPP
 

Olkiluoto3
 

In June 2004 Elpanneteknik received the order from Siemens AG to deliver a complete (turn-key) electric steam boiler plant (2x15MW, 10kV) to Finland's new nuclear power plant Olkiluoto 3.

     
 
   Provalys and Gaselys
 
Boilers for ship Gaselys

Electric steam boilers (2x2500kW, 690V) have been delivered to Alstom Marine and installed in the largest LNG-carriers in the world (155.000 m3).

 
 
 

    AstraZeneca

AstraZeneca boiler erection
Installation of electric steam boiler (25MW, 10kV)at  AstraZeneca in Södertälje, Sweden.
 

     LNG-carriers

LNG carriers at harbor in St Nazaire

The ships Gaz de France, with 2 electric steam boilers, each with a power of 1500kW (440V) and Provalys, with 2 electric boilers, each with a power of 2500kW (690V), in the harbor of Saint Nazaire, France (year 2006). 

 
 
Elpanneteknik Sweden AB 
Pontongatan 5A, SE-61162 Nykoping, Sweden
Phone : +46-155 267 473 Fax: +46-155 267 415